5 SQ MTR HEAT MAT 750 WATT
SUNSTONE 10 YEAR WARRANTY
The cable in a SunStone Mat system is very similar to the cable found in a Loose Wire System. However, in this case, the cable is pre-fixed to a glass-fibre mesh providing the perfect spacing between each line of cable.
The fact that the cable is already perfectly spaced means that the SunStone Mat is extremely easy and quick to install, simply unroll the mat in a straight line until you reach the wall or unit on the other side of the room, cut the mat (not the cable), rotate the roll, and roll back up in the other direction. This process is to be repeated until the room is covered. This design reduces the time required to install the heater by 35%.
5 SQ MTR 80MM SPACING 750 WATT LOOSE WIRE
SUNSTONE 10 YEAR WARRANTY
Specifically designed to be used under stone and ceramic tiles, the Loose Wire System sits within the layer of flexible tile adhesive below the tile or stone floor finish. Alternatively, the system can be installed within a layer of self-levelling compound below the floor surface.
Suitable mainly for bathrooms, kitchens and conservatories, the Loose Wire System comes with a 10-year warranty to ensure long term comfort and reassurance.
BG CUMC50 Single Pole Type C Miniature Circuit Breaker MCB 50A
Single pole MCB
6kA breaking capacity
Positive contact status indication
Device can be locked in ON or OFF position with use of a device lock (BGE-CUA10)
Rating: 50A
BG CUMB50 Single Pole Type B Miniature Circuit Breaker MCB 50A
Single pole MCB
6kA breaking capacity
Positive contact status indication
Device can be locked in ON or OFF position with use of a device lock (BGE-CUA10)
Rating: 50A
Wylex NHXLB50 50A MCB SP Circuit Breaker Type B
Wylex 50A MCB, compatible with Wylex NM consumer unit range. Wylex NHXLB miniature circuit breakers detect overcurrents via overloads and fault currents and interrupt the supply to prevent damage to the installation. Wylex miniature MCB’s require less space therefore providing more wiring space for the installer making the whole process easier and quicker. During installation resistance testing live and neutral conductors do not have to be disconnected, this saves landlords time and money testing installations during occupancy voids.